Tuesday, February 28, 2012

February 28, 2012

Cheers! It's shamrock shake time which means March is right around the corner. We ponder... is the end in sight??

A few details in the family room.

Ceiling still needs to be trimmed... gettin' there!


Looking from the living room through the foyer and into the kitchen.

The front stairwell is coming along beautifully. I love the combination of all these textures.

Looking from upstairs all the way to the basement stairwell.

Amazing wood work details. Finally we have an artisan on site!


The master bedroom fireplace & ceiling are trimmed. There will be a door to cover the television.


Bedroom details.

Cabinets are being delivered. These have caused much grief! Let's hope they look good once installed...

Finally... TRIM WORK!

And the interior doors are installed. This is Sophie's closet.


Window trim details.

Baseboard trim detail.




The tin roofs are being installed and look amazing. We love the old fashioned detail they add.

The front porch was being worked on today. I snapped this photo from inside the car since it was sleeting and icky out. We're thrilled with the finish work being done and the pace with which it's coming together. Let's hope it keeps up! Installation of the cabinets will hopefully happen later this week so watch for more updates soon.

Wednesday, February 15, 2012

February 15, 2012

The tub arrived! Yes, I was nervous and apparently passed that along to Sophie as you can see in her facial expression. It weighs some 600 lbs and was delivered curbside. Ever thankful for the help we from the roofers moving it with their sky track!

The ceiling woodwork continues...

Foyer complete.

This big pile is what was left for the master bedroom ceiling. We have had so many LARGE wood piles on site during this project - miraculously they are all finding their places quite nicely.

TRIM! Wonder how long this will take to install???

The tub is uncovered... and Carey ponders how we will get it inside.

Love it! We have a beautiful chandelier to hang above it.

Our kitchen and laundry room farm sinks arrived as well - from Vintage Tub and Bath.

Another quick shot from the living room through the foyer and into the kitchen.

Stair parts are starting to arrive. Check out the curved bottom step - Carey chose well!

The last piece of wood flooring was installed on Friday. We are thrilled with it!

And the ceiling treatment is well on it's way to being complete.



A peek at the master bedroom ceiling. There will also be wood above the fireplace and a door to cover the TV. Can't wait!! Now we head into tedious trim and stairway details. One-step-at-a-time, right?