Thursday and Friday were very busy at the house this past week. The masons did a ton of work starting with the front and side faces of the porch, below the poured and stamped concrete top.


Walking in the front door of the old house you enter into the dining room and kitchen. The pass through fireplace was bricked in as well as the arch into the new house. A fireplace was located in the same spot when the house was first built so we were happy to honor this part of the past.





The chimney runs up through the center of the house so we get to see it in the upstairs hallway and the loft above the bedrooms. Love it!


This doorway passes through to the new section of the home into the front foyer.


A filled in window in the upstairs guest bedroom. The stone will stay exposed.



We decided to go ahead and frame in the basement. We have a "pool table" area and then there will be an arch into the living room area with a fireplace.


There will be a short hall down to a full bath and nice sized bedroom or office area.


A peek at the back porch with the roof closed in and the sun shining ~ a lovely spot for wine!


And last but not least the front porch on the addition was bricked in. Hoping to get the new roof on next week and then insulation... moving right along!

Saturday, October 15, 2011

October 14, 2011

The challenge of the week... We've got a back porch!


It will have pillars and we will have a screen that pulls shut to keep out any bugs.


Looking out from the great room.




As seen from my studio above the garage.


The fireplace between the kitchen and dining area will be cream city brick. Carey ran the venting up though the second floor where it will be visible from the hall - again, love the quirk!


The kitchen chimney venting up through the second floor and loft where it will also be bricked.


TONS of little things were accomplished this week as well. We hope to get the new roof in next week... fingers crossed!!

Thursday, October 6, 2011

October 6, 2011

Another week is flying by!

The long punch list of miscellaneous things that need to be dealt with

and fixed is slowly being whittled away...


The bedroom chimney is complete.



The great room chimney is complete as well!


We love how it turned out.


The girls enjoyed the sawdust piles in the kitchen and dining room, pretending it was sand.
Note: I wouldn't recommend tights for saw dust play.


The master bedroom fireplace is framed in.

There will be a matching Cream City brick surround topped with a cabinet door hiding the TV.

The upstairs hallway and sitting area present some challenges in the ceiling lines.
Good luck to the drywall crew!


The front stairwell as seen from the upstairs hall.


Another angle showing the somewhat chaotic ceiling. We love the "quirk" it provides.




The loft area above the girls rooms.




Sophie, Carey and Elle climbed on up to check out the view.


As we fully embrace autumn we hope to plow through the list of "to do" while the weather holds. It's so hard to believe that winter is near... Fingers crossed that we can move in before the first arctic blast!!